Name:
e-mail:
DANIEL J. COWEN
cowen.daniel603@gmail.com
Phone: 720-218-7411
Title:
Education:
Project Controls Scheduler
BS Business Administration – Regis University – In Progress
Affiliations: Current member of American Association of Cost Engineers international
(AACEi), Past VP of Rattlesnake Mountain group of AACEi, Beryllium Worker
Certified, Work Package Manager Certification, Radiological Worker II, Primavera
Project Planner ver. 3.3, Primavera Enterprise P6 ver. 8.4, Primavera contractor
ver. 6.1, Deltek Fuse, Microsoft Office Suite (Word, Excel, Project ver. 3, 7, and
10).
I have over 30 years’ experience in project controls scheduling and cost analysis. This experience
includes VA hospital construction, pipeline installation and well drilling, nuclear waste facility
construction, manufacturing, program development, system validation, remediation, nuclear facility
demolition, waste management and environmental restoration, transmission line renovations and
substation rework and construction, aerospace, and can manufacturing. I have been responsible
for schedule development, schedule validation, inter discipline coordination, proposal preparation,
set up program tracking controls, and Earned Value Management (EVM). My diverse scheduling
experience includes setting up the program Work Breakdown Structure (WBS) for a company in
the construction of an ethanol fuel plant, transitioned one company from Primavera version 3 to
Primavera Enterprise version 4 through version 5.
My experience includes:
· Jacobs Engineering – Denver, CO – Project Controls Scheduler – Validation of VA Hospital
construction schedule, developed an integrated schedule for the Bronco Pipeline Company
Niobrara Gathering System Project. This included preparing and monitoring the well drilling,
the pipeline and APC facility construction, the Bronco Station and Gathering system schedules.
Creating resource tracking reports and developing a project web page. Prepared resource
loading graphs and bi-monthly and monthly reports. Provided project controls support to the
Reliance Industries Limited – Petroleum Business E&P Front End Engineering Design (FEED)
project. Updated and maintained progress in the Primavera schedule, prepared weekly
schedule reports and published a project web page for the disciplines to have ready access to
the data. Prepared weekly and monthly status reports to the client including tracking of the
Master Document Register.
· Matrix Consulting, Inc. Hanford, WA - Senior Project Management Specialist - Matrix provided
project management/controls support to the Department of Energy (DOE) Waste Treatment
Facility (WTF) project. In this role I provided oversight of the Bechtel project schedule for the
construction of the Pretreatment facility. This included in-depth analysis of engineering,
procurement, and construction project schedules. Tracking critical path logic and validating
changes to the schedule. Performing assessments to confirm that work is being performed per
operating procedures. This required site visits to see actual work in progress as well as
attending ongoing progress and status meetings. Preparation of monthly progress reports for
DOE headquarters and local management. Support to other WTF projects in the development
and maintenance of Microsoft Office Project schedules ver. 3 & ver.7.
· North East Power Alliance (NEPA) National Grid, Regional Delivery Venture, Syracuse, NY -
Senior Scheduler - Developed and maintained resource loaded project schedules for both line
Page 1 of 3
and substation projects, prepared critical path analysis and earned value reports for
management. Prepared standard operating procedures for the scheduling and reporting
processes. Support to project subcontractors in the development and maintenance of
Microsoft Office Project schedules ver. 3 & ver.7.
· Range Fuels - Broomfield, CO - Senior Scheduler - Developed and maintained resource loaded
project schedules for the construction of a Biomass Ethanol Plant, prepared critical path
analysis and earned value reports for management and DOE reporting. Prepared standard
operating procedures for scheduling and change control processes. Monitored subcontractor’s
fabrication schedules for accuracy and impacts to overall project schedule.
· DJC Consulting, LLC. - Arvada, CO - Project Controls Consultant - Maintained in-progress
project schedules and proposal schedule development for Envirocon, Inc., and the S. M.
Stoller Corp. Supported the proposal team in the developement of resource and cost loaded
schedules for Energy Solutions / Washington Group / Tetra Tech (EWT) for a major
Department of Defense project. Maintained in-progress Microsoft Project ver.3 schedules and
development of new Microsoft Project ver. 7 schedules for can manufacturing production lines
and facility expansions at Ball Container Corp.
· Envirocon, Inc. - Golden, CO – Senior Scheduler - Developed resource loaded schedules, cash
flow curves, and earned value curves for proposal schedules. Maintained in-progress project
schedules by gathering information from field observations
and
internal
accounting
documentation. Followed reporting guidelines for schedule and cost submittals to Department
of Energy, Department of Defense, State and Local agencies. Tracked newly awarded projects
at various levels of detail to satisfy the client’s reporting needs for earned value reporting,
variance reporting, schedule and cash flow reviews.
Introduced Primavera Enterprise for
Construction (P5e/c ver. 5.0) to operations personnel and conducted training sessions for field
personnel. Prepared project baseline schedule and cash-flow curve procedures and training
presentation for their implementation.
· Rocky Flats Environmental Technology Site - Golden, CO - Senior Scheduler/Cost Analyst -
Developed an interim cost tracking system for the Solar Ponds Remediation Project. Prepared
monthly program budget reviews for Environmental Restoration, Waste Management, Rad
Safety, and Construction. Tracked leased labor program costs and prepared trend analysis
graphs for monthly reviews. Prepared baseline change proposals and power point slide
presentations. Developed schedules and tracked costs on the Sludge Removal Project.
Utilized real time data to identify trends, create graphs, and incorporate summary reporting.
Prepared a resource-loaded schedule for the demolition of all site buildings.
subcontractor invoices and approved purchase requisitions
Representative.
Verified
as
a
Contract
Technical
· McDonnell Douglas Corp. - Long Beach, CA
· Department of Defense C-17 Air Lifter Development - Program master scheduler - Tracked
vertical and horizontal schedule integration for the support equipment program. Provided
monthly status of work packages and analysis of variances to program management in
support of monthly, quarterly and ad hoc budget reviews. Developed monthly estimate to
complete reports. Prepared baseline change proposals as required.
· MD-80 Aircraft Program - Cost analyst - Verified data integrity including budgets, estimate
to complete, and actual costs incurred, and made corrective action recommendations to
project management. Supported three program clients in tracking the manufacturing and
delivery of aircraft; Swiss Air, Air Italia, and the China “kit” program.
To facilitate the
delivery and assembly of the semi-assembled MD-80’s for the Chinese, developed and
presented a training program for project controls. Successfully worked through an
interpreter to meet the course objectives.
Page 2 of 3
· Rockwell International - El Segundo, CA - Department of Defense B-1B Bomber Program -
Scheduler - Responsibilities included the development of schedules for the manufacturing of
priority and destiny critical parts. Assisted in the departmental loading of the numerically
controlled 3 & 5 axis machines. Developed schedules and tracked costs for the tooling division
as the development program moved into the production phase.
EMPLOYMENT HISTORY
Jacobs
Project Controls Scheduler
Matrix Consulting, Inc.
Senior Project Management Specialist
North East Power Alliance (AMEC)
Senior Scheduler
Range Fuels
Senior Scheduler
DJC Consulting, LLC.
Project Controls Consultant
Envirocon, Inc.
Senior Scheduler/Cost Analyst
Rocky Flats
Project Controls Analyst/Scheduler
McDonnell Douglas Corp.
Program Master Scheduler/Cost Analyst
Rockwell International, Scheduler, El Segundo, CA
2012 – Current
2010 – 2012
2010 - 2010
2008 – 2009
2007-2009
2003-2007
1992-2003
1985-1992
1981-1985
Page 3 of 3